The CSB's analysis of why the blowout preventer failed: effective compression, the miswired control pods, and the lack of testing for safety-critical equipment.
U.S. Chemical Safety and Hazard Investigation Board, Report No. 2010-10-I-OS, Volume 2, 5 June 2014.
Overview
The CSB's technical analysis of the blowout preventer. It found that the drill pipe buckled because of "effective compression" from pressure differences, not only the blowout flow; that the blue control pod was miswired and its battery drained, and a valve in the yellow pod was miswired; and that the deadman system most likely functioned but the buckled pipe stopped the rams from sealing. It argues that the BOP was not managed as safety-critical equipment.
Key pages
Printed page numbers, from the report's own table of contents.
- Synopsis and key findings: pp. 13–16.
- How the BOP was functioned: p. 23.
- The BOP: failure of a barrier: p. 31.
- Failure analysis of the BOP: p. 34.
- Establishing and maintaining effective barriers: p. 47.
- BOP not treated as a safety-critical element: p. 62.
- Regulatory gaps: p. 93.
- Recommendations: p. 95.
Source: U.S. government work, publicly released.