Deepwater Horizon Joint Investigation, Volume II (BOEMRE, 2011)
November 25, 2026 · 8:11 AM PT
#deepwaterhorizon#macondo#boemre#cement#jointinvestigation
The regulator's volume of the joint investigation: well design, the cement failure, the blowout preventer, regulatory findings and the companies' responsibilities.
Bureau of Ocean Energy Management, Regulation and Enforcement, Joint Investigation Team, Volume II, 14 September 2011.
Overview
BOEMRE's half of the joint investigation covers the well itself. It found that a central cause of the blowout was failure of the cement barrier in the production casing, that BP as operator was ultimately responsible for safe operations, and that Transocean and Halliburton also had responsibilities. It also covers the blowout preventer, regulatory findings and recommendations.
Key pages
Printed page numbers, from the report's own table of contents.
- Executive summary: p. 1.
- Well design: p. 25.
- Cementing: p. 40.
- Conclusions on well design, cementing and flow path: p. 68.
- Temporary abandonment: p. 85.
- Kick detection and rig response: p. 98.
- The Deepwater Horizon BOP stack: p. 129.
- BOP stack conclusions: p. 155.
- Regulatory findings: p. 157.
- Recommendations: p. 202.
Source: U.S. government work, publicly released.
Sources
| Source | Link |
|---|---|
| BSEE, official copy | Read ↗ |
Part of the Deepwater Horizon (2010) investigation.