Addendum to the Forensic Examination of the Deepwater Horizon Blowout Preventer (DNV for BOEMRE, 2011)
November 25, 2026 · 8:11 AM PT
#deepwaterhorizon#macondo#blowoutpreventer#dnv#forensicengineering
DNV's follow-up to its BOP report: corrections, a fault tree for the off-centre drill pipe, alternative theories and further support for elastic buckling.
Det Norske Veritas (DNV), for the Bureau of Ocean Energy Management, Regulation and Enforcement, 30 April 2011.
Overview
A short addendum to DNV's March 2011 report. It corrects parts of the text and answers clarifications BOEMRE asked for: a fault tree for how the drill pipe ended up off centre, the alternative theories DNV considered, whether the upper variable-bore ram hoses were cut by an ROV, and further modelling in support of the elastic buckling theory.
Key pages
Printed page numbers, from the report's own table of contents.
- Corrections to text: p. 2.
- Fault tree analysis: p. 5.
- Alternative theories: p. 8.
- Cutting (or not) of upper VBR hoses via ROV: p. 10.
- Support for the elastic buckling theory: p. 10.
Source: prepared by DNV under contract to BOEMRE and released publicly by the U.S. government.
Sources
| Source | Link |
|---|---|
| BSEE, official copy | Read ↗ |
Part of the Deepwater Horizon (2010) investigation.