Forensic Examination of the Deepwater Horizon Blowout Preventer, Volume I (DNV for BOEMRE, 2011)

November 25, 2026 · 8:11 AM PT

#deepwaterhorizon#macondo#blowoutpreventer#dnv#forensicengineering

DNV's forensic examination of the recovered blowout preventer for the Joint Investigation Team: why the blind shear rams could not seal around off-centre, buckled drill pipe.

Note: External links, including Wayback Machine archives, take you off this site. Use your browser’s Back button to return to this post.

Det Norske Veritas (DNV), for the Bureau of Ocean Energy Management, Regulation and Enforcement. Report EP030842, 20 March 2011.

Overview

DNV examined the recovered blowout preventer at the NASA Michoud facility for the Joint Investigation Team. It found that the blind shear rams did not close completely and seal the well because a section of drill pipe was trapped between the ram blocks, off centre and partly outside the cutting blades. It concluded that the pipe had buckled from forces during the loss of well control, most likely the flow of the blowout. The report also makes recommendations for industry and for further testing.

Key pages

Printed page numbers, from the report's own table of contents.

  • Executive summary, including the primary and contributing causes: pp. 1–9.
  • Methodology: p. 20.
  • Findings: BOP function testing: p. 26.
  • Findings: materials and damage assessment: p. 50.
  • Findings: ROV intervention efforts: p. 136.
  • Findings: modelling: p. 147.
  • Failure cause analysis: p. 164.
  • Conclusions: p. 171.
  • Recommendations: p. 175.

Source: prepared by DNV under contract to BOEMRE and released publicly by the U.S. government. Large file (about 10 MB).