Macondo: The Gulf Oil Disaster, Chief Counsel's Report (National Commission, 2011)
November 25, 2026 · 8:11 AM PT
#deepwaterhorizon#macondo#nationalcommission#cement#blowoutpreventer
The Commission Chief Counsel's detailed technical account of the Macondo blowout: the flow path, well design, cement, negative-pressure test, kick detection and the blowout preventer.
Chief Counsel, National Commission on the BP Deepwater Horizon Oil Spill and Offshore Drilling, 2011.
Overview
The technical companion to the Commission's final report. It follows the well step by step, from its design and cement job to the negative-pressure test, the missed signs of a kick and the crew's response, and sets out the technical and management findings for each. It found that the cement "did not seal off hydrocarbons in the formation." It gave no final conclusions on the blowout preventer, because DNV's forensic examination was still under way.
Key pages
Printed page numbers, from the report's own table of contents.
- Chapter 4.1, flow path: p. 39.
- Chapter 4.2, well design: p. 53.
- Chapter 4.3, cement: p. 67.
- Chapter 4.4, foamed cement stability: p. 111.
- Chapter 4.5, temporary abandonment: p. 127.
- Chapter 4.6, negative-pressure test: p. 143.
- Chapter 4.7, kick detection: p. 165.
- Chapter 4.8, kick response: p. 193.
- Chapter 4.9, the blowout preventer: p. 203.
- Chapter 5, overarching failures of management: p. 225.
Source: U.S. government work, publicly released. Large file (about 27 MB).
Sources
| Source | Link |
|---|---|
| U.S. Government Publishing Office, permanent link | Read ↗ |
| Commission website copy (Wayback Machine, February 2013) | Archive ↗ |
Part of the Deepwater Horizon (2010) investigation.
Note: Archived pages open in the Wayback Machine. Use your browser’s Back button to return here.